Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Dec 23, 2019     20-4 Bottom Wing Skins left and right step 2-6 - (9 hours) Category: Tail Feathers
prepared flap gap stiffener for both wings.
Preassembled W-1021 flap fairing and W-1024 aileron fairing for both wings. Final drilled all the holes, disassembled all parts, deburred all holes.
Countersunk holes on the rear spar assambly and dimpled the fairing as indicated.
Primed all the parts with Ekopoxy primer (two coats).

After curing riveted all the parts. Few rivets missing in the wing root rib area as it is difficult to rivet without an helping hand.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.